BP Silver Intersects Bonanza Grade Silver at the Cosuño Silver Project

by

in

BP Silver Intersects Bonanza Grade Silver at the Cosuño Silver Project

Silver mineralization was intersected in all four targets tested across an approximately 2.7 km NE-SW corridor, confirming the presence of a robust silver and polymetallic system which remains open for expansion along strike and at depth. Drilling intersected multiple zones of high-grade silver mineralization at the Pocañita Chica target: Diamond Drill Hole (“DDH”) CO-0008 returned 5m @ 600.4 g/t silver, including 1m @ 1655 g/t silver; CO-0009 returned 1m @ 526 g/t silver and 6m @ 147 g/t silver.

BP Silver Corp.
Fri, 02/27/2026 – 07:28


Comments

Leave a Reply

Your email address will not be published. Required fields are marked *